This middle east client was building a new sugar production factory and was required to install treatment systems for wastewater. The client had already selected electrocoagulation treatment for their needs and conducted a global search to locate a firm that could supply the required system. WaterTectonics was able to supply a system that the customer could integrate on their own without the need for on-site installers. This was important due to the remote nature of the project and the challenges with deployment of technical personnel to the region.
Project Library