Project Library

Pacific Coast Shredding – Industrial Stormwater

Vancouver, Washington, USA

Pacific Coast Shredding - Industrial Stormwater

industrial stormwater reduce metals
industrial stormwater reduce zinc
industrial stormwater reduce TSS
industrial stormwater reduce TSS

In 2011, WaterTectonics designed and installed an automated 300gpm treatment system to include electrocoagulation (EC), pH adjustment, clarification, and media filtration. Due to client site modifications and revised permitting, the system was replaced with a new updated EC system operating at 500gpm and granular activated carbon (GAC) vessels were added to meet trace metals compliance. The original system was relocated to operate at one of the client’s other facilities. WaterTectonics currently has treatment systems operating at five of their facilities.