This client needed a new control system at their pump station after the existing system was destroyed in a flood of sewage water. WaterTectonics was brought in to handle the repairs and began by installing a temporary pump to remove all the sewage. Once this phase was complete, WaterTectonics designed, engineered, and constructed a new 1,100 gallon per minute pump station to replace the existing one at the sanitary sewer pump station.
Project Library