This waste hauling company came to WaterTectonics to help them design a stormwater capture system for multiple facilities. The systems were designed to meet California’s Industrial General Permit requirements. Systems included pumps, tanks, and automation to track the volume captured during a given storm event and ensure that the client captured sufficient volume to meet the design standard. WaterTectonics also subcontracted and project managed the civil construction work that was required for the projects including installation of sumps, trench drains, tank pads, and miscellaneous electrical work.
Project Library