Project Details

Evergreen Church

Products Used

Evergreen Church

Bothell, WA

Four 15’ deep dewatering wells and a pond were constructed at this site. WATERTECTONICS used high head submersible pumps to move ground water from the wells to the pond for settling. A single pump was used to disperse pond water to a bio swale before entering North Creek.

All Projects| Previous project | Next project