Project Details
Products Used
Evergreen Church
Bothell, WA
Four 15’ deep dewatering wells and a pond were constructed at this site. WATERTECTONICS used high head submersible pumps to move ground water from the wells to the pond for settling. A single pump was used to disperse pond water to a bio swale before entering North Creek.
