SR522

Products Used

SR522

Woodinville, WA

Construction along a 3 mile stretch of SR522 produced a large amount of turbid stormwater that was high in pH. WATERTECTONICS was brought in to provide pH adjustment at 500GPM before the water entered into a treatment pond.