Project Details
Products Used
St. Anthony's Hospital
Gig Harbor, WA
During construction of the new hospital, a 300GPM WaveIonics electrocoagulation system was used to remove turbidity from site runoff. A million gallon pond was built to store on-site runoff during construction.
