WaterTectonics was contacted to assist at a superfund site cleanup in which remediation of contaminated sediments was taking place. The excavation on site was continuously dewatered during the project, producing a variable flow of solids laden water to be treated prior to disposal. WaterTectonics mobilized an ACISTBox for chemical injection in the treatment and filtration system. The client was able to conclude their project ahead of schedule, with zero safety incidents and zero non-compliant water discharges.